洗眼器ITB包含内容介绍
简介 Introduction
1.1 本说明规定了洗眼器的材料,设计,制造,标识,检验与测试的最低要求。
This specification covers the minimums requirements of materials, design, fabrication, inspection, testing and identification, etc. for SECURITY EYE-WASHING.
1.2 工厂名称及位置 Plant and Location:
(1) 业主名称 Owner:
(2) 项目名称 Project name:
(3) 位置Location:
1.3 资料优先权Priority of the documents
如果在工程规范、数据单以及其他参考标准规范中出现冲突,优先次序如下:
In case of conflicts between the engineering specification, data sheets and other reference codes and standards, priority shall be given as the following order:
(1) 数据单 Data Sheets
(2) 工程规范 Engineering Specification
(3) 引用的标准规范 The Codes and Standards Stipulated
(4) 买方认可的投标方文件Vender’s Documents (Agreed by Purchaser)
1.4 技术协调会议Technical Coordination Meeting
合同签订之后,投标方根据买方要求,应自费派出足够人数的专业人员到买方办公室主持技术协调会议,具体日程如下:
After the order is awarded, Vendor shall, upon request of Purchaser, send the sufficient number of qualified personnel to Purchaser’s office at vendor’s cost to hold the technical coordination meeting(s) according to the following schedule:
1.5 报价文件中价格应按以下项目进行分项报价:
Price in proposal shall be broken down as follows:
(1) 设备费 Cost of hoist package
(2) 包装及运输费(至现场)Cost of packing and transportation (Delivery to job site)
(3) 开车及调试用备件费 Cost of spare parts for erection and commissioning
(4) 两年操作备件费 Cost of spare parts for 2 years operation
(5) 安装试车指导费用(按日)Cost of supervision for installation and pre-commissioning
(6) 其余见供货清单 Others refer to scope of supply
使用方法
洗眼部分的使用方法
|
|
喷淋部分的使用方法
|
洗眼部分和喷淋部分的使用方法
|